Retrofitting CSO Infrastructure in New Haven, Connecticut
(No paper) The City of New Haven Water Pollution Control Authority operates a wastewater collection and treatment system which serves over 130,000 residents in the cities of New Haven,...

Environmental Restoration and Management of the Tres Rios Demonstration Constructed Wetland Project: Mosquito Monitoring, Control and Management Efforts
(No paper) The Tres Rios Demonstration Constructed Wetland Project in Phoenix, Arizona, is providing valuable information on the role of constructed wetlands in ecosystem restoration,...

The Tres Rios River Management Plan: The Result of Multi-Agency Partnering for Management and Restoration at the Confluence of the Salt, Gila and Aqua Fria Rivers
(No paper) The framework consists of a an Oversight Committee made up of Agency Department Heads, a Steering Committee comprised of local area Agency managers, and five Technical Committees:...

Sheetflow Water Quality Monitoring Device: Results of Nine Month Field Testing
(No paper) The objective of this 30 month research project was to develop a sheetflow sampler for sampling highway runoff. The specific goals of this Small Business Innovation Research...

Title Transfer of U.S. Bureau of Reclamation Projects: Fact or Fiction
(No paper) The U.S. Bureau of Reclamation (Reclamation) has constructed hundreds of water storage and delivery projects throughout the 17 western United States. These projects vary in...

Why the Latrines in Benin are so Few and Far Between: Implications for Improving Sanitation in Developing Countries
(No paper) This paper contributes to such an understanding with research about how consumers make their sanitation choices in developing countries from a case study of latrine adoption...

Water Resource Systems and Modeling of the Lower Virgin River Using EXCEL
(No paper) The first objective of this study was to determine the availability of water at the confluence of the Halfway Wash and the Virgin River and to simulate the diversion of river...

Putting Nature First
From salamander tunnels to hotels for red-legged frog, the $450 million Los Vaqueros dam and reservoir project in northern California put environmental concerns first in its planning and...

Conquering the Cold
Three projects�a water treatment plant, an airport, and a hydroelectric plant�illustrate how practicing engineering in Alaska differs from working in the contiguous 48 states. Permafrost,...

A Joint Effort
In a public-private partnership that required close working relationships, a project that aimed to restore an old canal system� and its waterfront�in Richmond was combined with an effort...

Tall Order
Successive earthquakes have damaged the 32-story, 460 ft (140 m) tall Los Angeles City Hall, built in 1926. Masonry infill and concrete walls have cracked, and the terra cotta cladding...

Back from the Brink
The Cape Hatteras Lighthouse, the tallest brick lighthouse in the United States, has been moved to prevent it from toppling into the sea as a result of coastal erosion. Engineers from...

Managing the Megaproject
The Mon/Fayette Expressway and Southern Beltway will link Pittsburgh, Pennsylvania and Morgantown, West Virginia via a 104 km, $3.5 billion Y-shaped highway. With the project split into...

All Eyes on I-15
The largest single highway construction contract in United States history is currently underway in Salt Lake City, Utah. The Utah Department of Transportation's innovative...

Special Geotechnical Testing: Central Artery/Tunnel Project in Boston, Massachusetts
The Central Artery/Tunnel Project (CA/T) in Boston, Massachusetts, is the largest urban highway construction project in the history of the interstate system. The magnitude and complexity...

GIS Paves the Way
The National Environmental Policy Act (NEPA) of 1969 requires an environmental impact assessment study for all Federal-aid transportation improvement projects. NEPA studies evaluate potential...

Preparing Specifications for Design-Bid Build Projects
The Committee on Specifications of the Construction Division of ASCE has developed a guide to preparing construction specifications for design-bid build projects. The guide contains preparation...

Consulting Engineering
A Guide for the Engagement of Engineering Services
Consulting Engineering: A Guide for the Engagement of Engineering Services (Manual 45), is a comprehensive revision of the previous edition...

A Tale of Two Bids
In early 1992, the Escambia County Utilities Authority determined that its 2 mgd Avondale Wastewater Treatment Plant should be expanded to 8 mgd to meet the growing needs of the Pensacola,...

Inviting Trouble Downstream
When dam-building advocates, representing power generation, irrigation and flood control interests, get their project built, flood control ranks third in priority. Soon, development encroaches...

 

 

 

 

Return to search